Development type:
Shopping and Leisure centre and offices (102,000 sqm).
Input:
Traffic flow studies , EIA input, new street and intersection designs, access and ramp designs, internal circulation, delivery zones and parking design.
Involvement:
Preliminary masterplan, detailed concept designs, negotiations with key authorities, detailed design and permitting.
Challenges:
- Multiple points of access
- Interface with metro
- Motorway connections